These are the ways to install Tuff PP-R pipes.
-
Cutting PP-R Pipes To Proper Length
Cut pipes perpendicularly to its axis with a pipe cutter or a rotary pipe cutter

-
Cleaning & Marking
Before fusion, clean up the end of the pipe and a fitting, mark the depth of the insertion of pipe into a fitting in accordance with the table

-
Welding of Elements
when the heating temperature has reached the required 260’C, push the filter and the end of the pipe on the welding ends by means of a sliding non-rotary motion to the depth previously marked and heat them according to the time specified in the table.

-
Joining
Take a pipe and a fitting off the welding ends and join them by pushing without turning, up to the previously marked welding depth During pushing determine the mutual position of a pipe and a fitting. Leave a joint still until it reaches the required stability.

